THE BUILDING OF

Little Toot 5

Undercoating of the Exterior of the House.

Haden and Ximo gluing the cockpit sole.

The teak cut out for the Towing and Samson post

Alloy mast made.

Haden spraying the inside of the house.

Wiring of the dash, and it all fitted into the boat.

Just painted the topsides with Interprotect.

Haden fitting the aft teak deck.

48 mm planks with 5 mm seams.

Paul has made the mounting blocks for the roof, first coat of primmer on the cockpit and Paul applying the final coat inside the house.