
|
THE BUILDING OF Little Toot 5 |





|
Undercoating of the Exterior of the House. |


|
Haden and Ximo gluing the cockpit sole. |
|
The teak cut out for the Towing and Samson post |


|
Alloy mast made. |






|
Haden spraying the inside of the house. |
|
Wiring of the dash, and it all fitted into the boat. |
|
Just painted the topsides with Interprotect. |





|
Haden fitting the aft teak deck. 48 mm planks with 5 mm seams. |



|
Paul has made the mounting blocks for the roof, first coat of primmer on the cockpit and Paul applying the final coat inside the house. |