THE BUILDING OF

Little Toot 3

Finished the stern, ready for fairing and painting

Laying the 300 kgs of lead and epoxy void filler in for ballast.

Fairing finished over the lead, ready for painting, a LOT of sanding!!!

Two coats of ‘Interprotect’ .

Fitting of the Fore Deck and the forward Gunwhale

Gluing in the top of the water tank and the Cooler box slides and rudder stops finished

Gunwhale finished and trimmed. Building of the aft deck supports.

Test fit of Engine and Thrust bearing.

Forward Gunwhale completed, Cap rail fitted. Cap rail is 4 laminates of 12 mm Ply.

Forward water tank flange fitted and tank painted. This tank is mainly for ballast.